EN
Song Than 1 Industrial Park
$300/㎡价格(含物业费不含税费)
面积178 ha 土地使用年限1995 - 2045
地址Street 9, Song Than 1 Industrial Park, Di An City, Binh Duong Province, Vietnam
园区概况

Song Than I Industrial Park is backed by THALEXIM Joint Stock Company, which operates under the full name Thanh Le Import-Export Corporation. THALEXIM Joint Stock Company also serves as the investor for significant industrial parks in Binh Duong, including the Binh Duong Industrial Park.

The establishment of Song Than I Industrial Park is based on Decision No. 577/TTg, dated September 16, 1995, by the Prime Minister. Subsequently, the People’s Committee of Binh Duong Province issued a decision on May 12, 2008, making adjustments to the park’s planning, as specified in Decision No. 1444/QD-UBND.


Industrial Park Scale

Song Than I Industrial Park encompasses a total industrial land area of 178.1 hectares, with specific areas allocated for different land uses, including:

  • Land for industrial factory construction 112.51 hectares
  • Area of ​​warehouses, yards, and service management facilities 27.2 hectares
  • Area of ​​land planted with green trees and water surface 12.2 hectares
  • Land for the headquarters of the Department of Technical Infrastructure
  • Construction 4.69 hectares
  • Land transport 0.75 hectares
 
 

Industry attracting investment

Mechanical engineering, manufacturing machinery and equipment, assembling and manufacturing means of transportation, construction machinery, construction structures made of concrete and steel; Agricultural and forestry product processing industry includes: processing rubber, cashew, coffee, animal feed, wood; Light industry includes garments, electricity, electronics.​

 
租金及费用
租金 土地租金 $300/平方米
其他费用 Infrastructure management and maintenance fee 0.4 USD/m2/year
Electricity supply price From 0.03 USD/kWh – 0.1 USD/kWh depending on time of electricity use
Water supply price 0.4 USD/m3
Wastewater treatment fee 0.28 USD/m3
Labor cost ranging from $250 to $500 per person per month.
交通区位
基础设施配套

Internal traffic

4-lane main axis 31m wide; 2-lane branch axis.


Electricity system

The electricity supply system runs along the plots of land and along the fences of factories. The power supply comes directly from the national 110 KV line, through the 110KV-22 MVA Transformer Station, thus always maintaining a stable power source for the factories’ production activities. Medium voltage power grid along the roads, providing stable power for all factories.


Clean water system

Clean water supply plant with capacity up to 50,000 m3/day and night.


Wastewater treatment system

Centralized wastewater treatment plant has a total capacity of 8,400 m3/day and night.


Telecommunications System

Given the substantial demand for telecommunications and information systems by businesses within Song Than I Industrial Park, the park has invested in a telecommunications system encompassing IDD, ADSL, 6,000 numbers, and a maximum bandwidth of 2GB to meet all business requirements.

税收优惠政策
相似推荐
咨询

扫码咨询

联系电话

返回顶部

扫码添加客服人员