EN
Tien Son Industrial Park - Bac Ninh
$90/㎡价格(含物业费不含税费)
面积332 ha 土地使用年限2006 - 2056
地址Dong Nguyen, Hoan Son, Noi Due, Tuong Giang, Tien Son district (now Tu Son town), Bac Ninh province
园区概况

Tien Son Industrial Park – Bac Ninh was established according to Decision No. 1129/QD-TTg dated December 18, 1998, by the Prime Minister of the Government. In the decision, Viglacera Corporation – JSC (VIGLACERA) is the investor responsible for the construction and technical infrastructure business in Tien Son Industrial Park – Bac Ninh.

Through multiple adjustments, according to Document No. 808/CP-CN dated June 18, 2003, by the Government, approving the expansion plan of Tien Son Industrial Park, Bac Ninh province, and Decision No. 1372/QD-BXD dated November 2, 1999, by the Minister of Construction, approving the detailed plan of Tien Son Industrial Park, Bac Ninh province (Phase I).

Decision No. 475/QD-BXD dated March 30, 2005, by the Minister of Construction, approves the detailed plan for the expanded Tien Son Industrial Park, Bac Ninh province (Phase I), with an approved area of 350 hectares.

The industrial park has a large scale, covering an area of 350 hectares, including 24 hectares of urban land. Tien Son Industrial Park is one of the first industrial parks in Vietnam closely connected to the urban area. The industrial park was established in 1999 and is divided into two phases:

  • Phase 1: 1999 – 2049
  • Phase 2: 2006 – 2056
  • The total registered investment capital is 834.3 billion Vietnamese dong.

On August 5, 2011, the People’s Committee of Bac Ninh province issued Decision No. 936/QD-UBND approving the adjustment of the detailed construction plan of Tien Son Industrial Park, reducing an area of 19.95 hectares for local construction of residential and service areas. The industrial park was approved with a planned area of 332.05 hectares.

租金及费用
租金 土地租金 $90/平方米
其他费用 Infrastructure management and maintenance fee 0.5 USD/m2/year (excluding VAT)
Annual land lease fee According to provincial regulations
Clean water supply cost 0.4 USD/m3
Electricity cost According to the electricity tariff of EVN (ranging from 0.066 USD to 0.12 USD/KWh)
Wastewater treatment fee 0.28 USD/m3 (excluding VAT)
交通区位
基础设施配套

Power supply system
The VSIP-Bac Ninh Industrial Park enjoys a direct and reliable power supply from the national grid, ensuring an ample and uninterrupted flow of electricity to support both industrial production and daily operational activities within the park.

Clean water supply system
The water supply for Phase I is sourced from a water treatment plant with a daily capacity of around 10,000 m³, while Phase II boasts an even higher capacity of 13,000 m³ per day.

Wastewater treatment system
Located in the southeast of the project area, the VSIP-Bac Ninh Industrial Park houses a wastewater treatment plant that operates independently from the stormwater drainage system. Factories and plants within the park are obligated to pretreat their wastewater to adhere to Class B standards before discharging it into the centralized wastewater treatment system. Efficiently managing the wastewater flow, the industrial park employs three pumping stations with an average capacity of approximately 5,600 m³ per day, ensuring the smooth transportation of all wastewater to the park's treatment plant.

Transportation system within the park
The Industrial Park boasts a central road spanning 34 meters wide, accommodating 4 to 6 lanes, while the main roads within the premises measure 23 meters wide and feature 2 lanes.

Fire protection system
Fire hydrants are installed along the roads within the industrial park according to legal standards.

Communication system
A modern communication system offers an extensive array of postal and telecommunications services.

税收优惠政策
相似推荐
咨询

扫码咨询

联系电话

返回顶部

扫码添加客服人员