EN
Phu My 2 Expansion Industrial Park
$195/㎡价格(含物业费不含税费)
面积400 ha 土地使用年限2008 - 2058
地址 Tan Phuoc and Phuoc Hoa wards, Phu My town, Ba Ria – Vung Tau province.
园区概况

The Phu My 2 Expansion Industrial Park is established under Decision No. 2504/QD-UBND dated December 25, 2019, and July 2008.
This industrial park in Ba Ria-Vung Tau province has a medium scale (approximately 400 hectares) with a usage term of 50 years from July 25, 2008, and was developed by IDICO Group, a leading and prestigious investor in Vietnam.

The land use planning at Phu My 2 is expanded as follows:

  • Land for the construction of factories and plants: 241.39 hectares.
  • Warehouse land: 9.1 hectares.
  • Traffic land: 26.24 hectares.
  • Land for the construction of specialized ports: 22.66 hectares.
  • Static traffic land (parking lot): 1.33 hectares.
  • Land for administrative and service works: 1.97 hectares.
  • Land for key technical works: 9.42 hectares.
  • Green land and water surface: 85.91 hectares.


Currently, the Phu My II Expanded Industrial Park has leased over 126 hectares of land, with an occupancy rate of over 46%, and hosts numerous large-scale investment projects, such as the Ultra-white float glass factory project and the Steel and auxiliary factory project of Hoa Phat.

the Phu My 2 Expanded Industrial Park is currently attracting investment in many fields, including:

  • Mechanical equipment and spare parts manufacturing.
  • Mechanical assembly industry.
  • Mechanical repair industry.
  • Manufacture of industrial and specialized electronic equipment.
  • Production of components, components, and accessories.
  • Producing electronic materials and consumer electronic products.
  • Metallurgy, rolling and drawing, post-rolling products.
  • Production of consumer, cosmetic, and industrial chemicals.
  • Production of fertilizers and microbial plant protection drugs.
  • Textile and garment industry.
  • Producing high-quality footwear and leather.
  • Plastic industry.
  • Ceramic, porcelain, glass industry,…

Labor resources and costs:  
The labor source in the Phu My II Expanded Industrial Park is extremely abundant, providing a significant advantage to accelerate the development speed of the industrial park.Moreover, with its highly favorable geographical location and modern transportation network, the Phu My II industrial park can easily attract labor from many surrounding areas, especially in the southern region. Simultaneously, it aids in solving employment problems for many workers.

租金及费用
租金 土地租金 $195/平方米
其他费用 Management and maintenance fees 0.65 USD/m2/year(adjustable annually by 3.5%)
Clean Water Usage Fee 12,500VND/m3 (according to regulations of Ba Ria - Vung Tau province)
Electricity Usage Fee 22kV electricity price (excluding VAT) according to State regulations is as follows: Peak hours (9:30-11:30; 17:00-20:00): 2,871 VND/kWh Off-peak hours (22:00-04:00): 1,007 VND/kWh Normal hours (04:00-09:30; 11:30-17:00; 20:00-22:00): 1,555VND/kWh
Wastewater Treatment Fee 0.4 USD/m3
交通区位
基础设施配套

Internal Transportation 
Main road D3, cross-section 63m, road section 24m, median strip 3m.
Internal branch road: 2 lanes, 8m wide.

 

Power system
The electrical system at Phu My II Industrial Park is directly supplied by the National Power Grid managed by Tan Thanh Electricity / Ba Ria – Vung Tau Electricity, supplying to the foot of the Factory fence. The supply voltage for factories here is 22 kV.
The power system in expanded Phu My II will be distributed regularly across the internal traffic network, ensuring that in case the national power system has a problem, the power system on these traffic routes will still be intact, can operate stably, and will not cause any problems for businesses during production.

 

Water Supply System
The water supply system is provided by the Toc Tien Water Plant with a capacity of 50,000 m3 /day and night. 

 

Wastewater System
The wastewater treatment plants have been completed and put into operation. These factories will receive industrial wastewater from areas surrounding the factories with a phase 1 capacity of 4 000 m3 /day and night. The treated wastewater is then discharged into the environment.

 

Drainage system
At Phu My II Industrial Park, the rainwater drainage system and wastewater drainage system are separate along the roads in the Industrial Park.

 

Communication System
The telecommunications system  is fully designed and can be customized according to customer needs. The communication system here is provided by service companies such as VNPT, FPT, and Viettel to ensure domestic and international communication by phone, fax, mobile phone, and fiber optic Internet.

 

Natural Gas System
The Phu My II Expansion Industrial Park has a natural gas supply source, serving specific investors with gas needs.
The two natural gas suppliers are:
Vung Tau Low-Pressure Gas Distribution Enterprise, connected from Phu My 1 low-pressure gas station.
Hai Linh Company Limited in Phu My II Industrial Park.
In addition, Phu My II expansion also has a stable source of natural gas from the Nam Con Son field with large gas reserves.

 

The Port System Inside and Outside Phu My II Industrial Park
Phu My II Industrial Park expands near Cai Mep Port, Phu My Port, SP-SPA International Port, Saigon Vietnam International Port, and PTSC Port… These ports can receive ships from 80,000 tons to 200,000 tons.
In particular, Cai Mep Port has container ships going directly to Europe and America without having to transit through a third country.
Not only that, the expanded Phu My II also has an inland waterway port system located right inside the Industrial Park. This port can receive ships and barges of up to 5,000 tons. Convenient for transporting raw materials and goods domestically and regionally.

税收优惠政策
相似推荐
咨询

扫码咨询

联系电话

返回顶部

扫码添加客服人员