EN
Phu My 2 Industrial Park
$195/㎡价格(含物业费不含税费)
面积620 ha 土地使用年限2005 - 2055
地址Phuoc Tan Ward and Phu My Ward, Phu My Town, Ba Ria - Vung Tau Province, Vietnam.
园区概况

Phu My II Industrial Park was established under Decision No. 1729/CP-CN of the Prime Minister dated November 18, 2004, and Decision 2089/QD-UBND dated June 29, 2005, by the People’s Committee of Ba Ria province – Vung Tau. 


Phu My II Industrial Park ,the planned area is 620.6 hectares, with 388.93 hectares allocated for industrial land rental.
However, as per Decision No. 2785/QD dated September 15, 2021, the People’s Committee of Ba Ria Vung Tau province has adjusted the industrial land rental area in Phu My II Industrial Park from 388.93 hectares to 425.49 hectares, including land for factory construction and warehouse space.

The land use structure in Phu My II Industrial Park is as follows:

  • Industrial land: 322.22 hectares.
  • Land for warehouse construction: 66.71 hectares.
  • Land for the service operation center: 15.8 hectares.
  • Green land and water surface: 153.85 hectares (with green land accounting for 90.88 hectares and water surface accounting for 62.97 hectares).
  • Transportation and port land: 55.57 hectares (with transportation land accounting for 37.7 hectares and specialized port land accounting for 17.8 hectares).
  • Land for key technical works: 6.45 hectares.

The area of land for lease in Phu My II Industrial Park is 304.94 hectares, with an occupancy rate of 77.24%.

Industries encouraged to invest in Phu My II Industrial Park include:

  • Consumer goods processing industries: food processing, textile industry, shoe manufacturing, paper industry, agricultural and forestry product processing, etc.
  • Biotechnology.
  • Mechanical technology of assembly and repair.
  • Electronic information technology: Production of industrial and specialized electronic equipment, production of components, accessories, electronic supplies, and civil electrical products.
  • Production of building materials.
  • Production of medical equipment and instruments.
  • Production of stationery and school supplies.
  • CO2 Gas production, liquefaction filling, industrial gas, medical gas; Production and preparation of lubricants; Depot.
    Production of cables and electrical equipment; Production and assembly of electronic and telecommunications equipment.
  • Manufacturing industries that require port use.
  • Environmental industry and energy-saving (no solid waste treatment).

Phu My II Industrial Park benefits from the abundant local labor resources in Ba Ria – Vung Tau province. This location is home to approximately 1.2 million people. Moreover, the working-age population constitutes over 60% of the total residents.

租金及费用
租金 土地租金 $195/平方米
其他费用 Management and maintenance fees 0.65 USD/m2/year(adjustable annually by 3.5%)
Clean Water Usage Fee 12,500VND/m3 (according to regulations of Ba Ria - Vung Tau province)
Electricity Usage Fee 22kV electricity price (excluding VAT) according to State regulations is as follows: Peak hours (9:30-11:30; 17:00-20:00): 2,871 VND/kWh Off-peak hours (22:00-04:00): 1,007 VND/kWh Normal hours (04:00-09:30; 11:30-17:00; 20:00-22:00): 1,555VND/kWh
Wastewater Treatment Fee 0.4 USD/m3
交通区位
基础设施配套

Internal Transportation 
Internal roads include the Main road system D3, N6, and the bone road system connecting to the factory gate. 
Main road D3: 14 m long, 63m cross-section, 24 m road section, 3 m median strip.
Main road N6: 10 m long, 31 m cross-section, 15 m driving distance.
2-lane branch road, 8 m wide.


Power system
The electrical system at Phu My II Industrial Park is directly supplied by the National Power Grid managed by Tan Thanh Electricity / Ba Ria – Vung Tau Electricity, supplying to the foot of the Factory fence. The supply voltage for factories here is 22 kV.

 

Water Supply System
The water supply system of Phu My II industrial park is provided by the Toc Tien Water Plant with a capacity of 50,000 m3 /day and night. 

 

Wastewater System
The wastewater treatment plants in Phu My II Industrial Park have been completed and put into operation. These factories will receive industrial wastewater from areas surrounding the factories with a phase 1 capacity of 4000 m3 /day and night. The treated wastewater is then discharged into the environment.

 

Drainage system
At Phu My II Industrial Park, the rainwater drainage system and wastewater drainage system are separate along the roads in the Industrial Park.

 

Communication System
The telecommunications system within Phu My II Industrial Park is fully designed and can be customized according to customer needs. The communication system here is provided by service companies such as VNPT, FPT, and Viettel to ensure domestic and international communication by phone, fax, mobile phone, and fiber optic Internet.

 

Natural Gas System
Currently, Phu My II also invests and builds natural gas supply systems, which have been planned and are currently being provided to investors in need.

 

Fire Protection System
Phu My II Industrial Park has been equipped with a fire prevention and fighting warning system that strictly complies with Vietnamese state regulations. It always ensures to keep in touch with the district and town fire prevention teams to ensure the safety of investors and workers of the industrial park.

 

Security System
Phu My II has established a security team within the area to ensure personal safety and protect investors’ assets. The industrial park’s security team will regularly keep in touch with the economic police team in the area to ensure the safety of businesses, investors, and workers here.

 

税收优惠政策
相似推荐
咨询

扫码咨询

联系电话

返回顶部

扫码添加客服人员