EN
Lai Cach Industrial Park
$140/㎡价格(含物业费不含税费)
面积135 ha 土地使用年限2008 - 2058
地址Lai Cach town and Cao An commune, Cam Giang district, Hai Duong province, Viet Nam.
园区概况

The Lai Cach Industrial Park was approved for detailed planning under Decision No. 1728/QĐ-UBND dated May 22, 2008, by the People’s Committee of Hai Duong Province.

The Lai Cach Industrial Park was established according to Decision No. 1836/QĐ-UBND dated May 30, 2008, by the People’s Committee of Hai Duong Province. The registered investment capital for the project is over 468 billion Vietnamese dong, with an operational duration of 50 years (until January 1, 2057). 

With its favorable geographic location, well-developed infrastructure, comprehensive facilities, and significant investment incentives, the industrial Park has gained its unique strengths in attracting both domestic and foreign investors. To date, it has become one of the most promising industrial Parks in the Northern region, and indeed, throughout the entire country.

Industrial Park Scale
The total area of the Lai Cach Industrial Park is 134.42 hectares, with land allocation percentages as follows:

  • Industrial Land: 94.153 hectares, accounting for 69.98% of the industrial Park area.
  •  Central Management and Service Area of the Industrial Park: 2.99 hectares, accounting for 2.22%.
  •  External Storage and Port Area: 2.86 hectares, accounting for 2.13%.
  • Clean Water Pumping Station Land: 2.036 hectares, accounting for 1.51%.
  •  Wastewater Treatment Facility Land: 1.12 hectares, accounting for 0.83%.
  • Industrial Park Cultural and Sports Center Land: 3.07 hectares, accounting for 2.28%.
  •  Greenery Land: 14.80 hectares, accounting for 11%.
  • Transportation Land: 13.517 hectares, accounting for 10.05%.

The main industries in the park include

  • Electronics and computer assembly industry
  • Industrial machinery manufacturing, agricultural machinery
  • High-tech industrial enterprises
  • Light industries

Labor costs

  • The labor cost in Lai Cach Industrial Park, located in Cam Giang district, belongs to Zone III.
  • In Zone III, the prevailing minimum wage stands at 3.430.000 VND per month at present.
租金及费用
租金 土地租金 $140/平方米
其他费用 Management Fee and Infrastructure Maintenance Fee 20000 VND/m²/year, approximately 0.83 USD/m²/year
Clean Water Usage Fee 14500 VND/m³, approximately 0.6 USD/m³
Electricity Usage Fee Normal Hours: 1853 VND/kWh, approximately 0.077 USD/kWh. Off-Peak Hours: 1210 VND/kWh, approximately 0.05 USD/kWh. Peak Hours: 3383 VND/kWh, approximately 0.14 USD/kWh.
Wastewater Treatment Fee 0.35 USD/m³
交通区位
基础设施配套

Internal Transportation 
The main roads within the industrial park have a width of 30m to 33m, while the branch roads have a width of 13.5m to 17.5m.


Electrical System 
The electricity supply is provided by the Hai Duong Power Company, ensuring stable 24/24 power supply for businesses even during peak seasons or according to individual needs.


Water System
A portion of the water used in the industrial park is sourced from the Hai Duong Water Plant and the Cam Giang Water Plant, with a capacity of 20,000 m³/day and night.


Wastewater and Rainwater Drainage System


Waste Treatment 
Solid waste from the factories within the industrial park is classified, collected, and transported to the centralized landfill in Hai Duong City.


Communication Information System
The entire communication system will be invested and constructed by the Hai Duong Provincial Postal Service to ensure efficient communication services for businesses worldwide.


Lighting System 
Both sides of the road have designed and installed high-pressure Sodium 150W lamps, with an average distance of 30m between lamp posts, providing an average illumination level of 10 lux.

税收优惠政策
相似推荐
咨询

联系电话

返回顶部