EN
Dai An Industrial Park Expansion
$140/㎡价格(含物业费不含税费)
面积416 ha 土地使用年限2006 - 2056
地址Cam Giang District and Hai Duong City, Hai Duong Province, Vietnam.
园区概况

The Dai An Industrial Park Expansion was granted permission for 
establishment by the Government of the Socialist Republic of Vietnam, as per Document No. 1059/TTg-CN dated July 7, 2006.

 In May 2016, the Dai An Industrial Park Expansion received approval for adjustments to its detailed construction plan from the People’s Committee of Hai Duong Province . 

The Dai An Industrial Park Expansion (Phase II) was officially established by the People’s Committee of the province on May 7, 2021. Its development direction emphasizes a multi-sector industrial Park, excluding heavy industries, and ensuring minimal environmental impact. Enterprises investing in this industrial Park are required to have advanced technology production lines and must build wastewater treatment systems that meet international standards. 

Industrial Park Scale and Land Use

Total Area:416.21 hectares  
Phase 1:189.02 hectares  
Phase 2: 226 hectares  

Land Use Distribution:

- Industrial Land:375.83 hectares, accounting for 68.21% of the total industrial park area
- Service Land: 25.19 hectares, accounting for 4.55%
- Sewage Treatment Facilities Land: 5.41 hectares, accounting for 0.98%
- Green Land: 55.762 hectares, accounting for 10.12%
- Transportation Land: 50.629 hectares, accounting for 9.19%

By the end of August 2019, the industrial park had attracted 47 secondary investment projects with a total investment of nearly $12 billion. Among these, 33 projects have already started production.

Industries attracting investment

Dai An Industrial Park Expansion primarily attracts various industries including:

  • Electronics manufacturing and assembly
  • Garment and textile production
  • Consumer goods manufacturing
  • Food processing
  • Packaging
  • PVC plastics
  • Parts and machinery assembly
  • Construction materials
  • Handicrafts and arts

Cost of Labor

  • The expanded Dai An Industrial Park is located in Cam Giang district, which falls under Zone III.
  • In Zone III, the minimum wage currently stands at 3.430.000 VND per month.
  • A few areas are situated in Tu Minh Ward, Hai Duong city, which belongs to Zone II. The minimum wage in Zone II is 3.920.000 VND.
租金及费用
租金 土地租金 $140/平方米
其他费用 Management Fee 0.3 USD/m²/year
Infrastructure Maintenance Fee 0.4 USD/m²/year
Clean Water Usage Fee 14500 VND/m³, approximately 0.6 USD/m³
Electricity Usage Fee Normal Hours: 1853 VND/kWh, approximately 0.077 USD/kWh. Off-Peak Hours: 1210 VND/kWh, approximately 0.05 USD/kWh. Peak Hours: 3383 VND/kWh, approximately 0.14 USD/kWh.
Wastewater Treatment Fee According to the industrial zone’s fee schedule (applied to each wastewater standard). Reference price: 0.3 USD/m³.
交通区位
基础设施配套

Internal Transportation 
has different cross-sectional dimensions: 39m, 35.5m, and 33m.


Electrical System 

22KV and a 110kVA power station (with 2 tanks of 63000KVA each), connected to the national grid (also can be customized).


Water System
Capacity: 20,000 m³/day and night


Wastewater and Rainwater Drainage System
The systems are designed independently as separate systems.


Waste Treatment 
The investor will sign service contracts with professional waste treatment units.


Communication Information System
Internet: Broadband ADSL service, international telecommunications (IDD), fiber optic cables, and leased lines.
Telephone: The number of lines will be tailored to the investor’s requirements.


Fire Protection and Prevention System (PCCC) 
Strategically placed fire hydrants at intersections and in front of each factory within the industrial park ensure effective fire prevention and rescue operations.

税收优惠政策
相似推荐
咨询

联系电话

返回顶部